Loading...
Arrival and getting around 2017-06-08T12:43:04+00:00

http://www.tbilisiairport.com

Please note that the transport from the Airport to the Official Hotels and then the way back will be provided by the organizers.

Shota Rustaveli Tbilisi International Airport formerly Novo Alexeyevka International Airport, is the main international airport in Georgia, located 17 km (11 mi) southeast of the capital Tbilisi.

The first airport terminal building was constructed in 1952. Designed by the architect V. Beridze in the style of Stalinist architecture the building featured a floor plan with symmetric axes and a monumental risalit in the form of a portico. The two side wings featured blind arcades in giant order. A new terminal building was finished in 1990, designed in the International style In 1981 Tbilisi airport was the 12th largest airport in the Soviet Union, with 1,478,000 passengers on so-called central lines, that is on flights connecting Tbilisi with cities in other Soviet republics In 1998 the number of passengers had shrunk to 230,000 per year.

Tbilisi International Airport is operated by TAV since October, 2005. In Georgia the company also operates airport in Batumi for 20-year term starting from May 2007 TAV Airports Holding, which owns 76% shares in Tbilisi airport operator TAV Urban Georgia, agreed with the Georgian state-owned United Airports of Georgia to reconstruct the unused runway, one of the two runways at the Tbilisi airport. The old runway will be reconstructed and extended according to ICAO standards and code F regulations and will be able to accept all type of aircraft, including the Boeing 747-8, Airbus A380-800, Antonov An-225 and Antonov An-124. A new F Code taxiway is also planned.

Passenger traffic at the airport tripled between 2009 and 2016 to 2.2 million passengers.

February 2007 saw the completion of a reconstruction project, with the construction of a new international terminal, a car park, improvements to the apron, taxiway and runway and the acquisition of ground handling equipment. A rail link to the city centre has been constructed, with an infrequent rail service of 6 trains per day each way. George W. Bush Avenue leads from the airport to downtown Tbilisi.

The airport has a contemporary and functional design. It is designed to provide the optimum flow of both passengers and luggage from the parking lot to the planes, with a 25,000 m2 (270,000 sq ft) total usable area. There is scope for future expansions without interrupting terminal operations. It has high-tech contemporary systems, keeping passenger convenience and efficiency of the terminal operations in mind, throughout functional spaces organized in an elegant manner. The food and beverage operations are carried out by BTA at 7 points with a staff of 75, while ATU provides Duty Free services at its four stores. The total project cost was 90.5 million USD. The capacity of the terminal building is 2.8 million passengers per year. The implementing agency and the borrower for the project is TAV Urban Georgia, a concessionaire and special purpose vehicle for the construction and operation of the airport.

During 2016, the main runway of the airport was resurfaced and fitted with new navigation lights, which will improve the safety level of the runway. Runway guard lights, LED stop bar signals and guidance signs at all the holding positions on the airport’s main runway were also added. The instrument landing system was also upgraded to CAT II, which enables aircraft to land during poor weather conditions. The airfield lighting control and monitoring system was upgraded, including installation of new lighting signals on all four taxiways.

In June 2016, due to an increase in passenger demand, TAV Georgia started construction of a new arrivals terminal. The new complex will be integrated with the existing terminal building and is expected to increase the airport’s terminal capacity to 3.5 million passengers annually. The new arrivals terminal will occupy a total area of 12,000 m2(130,000 sq ft) and will be completed by the end of 2017.